The Black Run facility is a gathering and loading site for EnLink Midstream; crude oil and condensate are transferred from site via rail car. Similar to the Bells Run flare project, the Black Run project was a John Zink design. DPC installed all owner furnished equipment, associated piping, and electrical requirements. DPC integrated all instrumentation and control needs throughout the site, interlocking a variety of different vendor equipment in a local HMI for control of the flare system.