DPC self-performed the civil, mechanical, fabrication, and electrical installation of the Stalder Pad production infrastructure project. Construction included the fabrication and installation of 18 ea – 3” flow lines from the well head to the GPU’s.  DPC also installed 8 GPU’s, dehydrators, separators, condensate tanks and a truck load out facility within a 2 month construction schedule.