AMP Ohio is currently constructing a 40MW hydro-electric facility on the Ohio River in Parkersburg, West Virginia. The project proposal was gathered based on preliminary design drawings and quantities. Our offering included construction costs, design completion and
implementation of Balance of Plant I/O and controls and construction and commissioning schedule development and control.
The temporary power distribution contract comprised the installation of both aerial and underground distribution as well as 12.47kV sectionalizing cabinets, distribution transformers, power panels, stadium lighting, SF6 automatic transfer switch, and 750kW stand-by generator