DPC has performed multiple scopes of work for Memorial Health Systems since the 1990’s. These projects have ranged from a $2.3mm ER and OR expansion (2004) to a $350,000 OR reconstruction at their Selby Campus Facility. Our scope on these projects has included various degrees of medium voltage distribution, life safety, critical systems and medical grade general distribution.